BY EMMA PETER, ABUJA
The Nigerian Upstream Petroleum Regulatory Commission (NUPRC) has welcomed the Final Investment Decision (FID) by TotalEnergies EP Nigeria Limited and AMNI International Petroleum Development Company Limited on the development of the Ima Gas Project.
The FID was announced on Wednesday, September 23, 2026, paving the way for the development of the offshore gas field, which is expected to play an important role in supplying feed gas to Nigeria LNG’s Train 7 expansion.
Speaking at the FID ceremony in Abuja, the Commission Chief Executive of NUPRC, Mrs. Oritsemeyiwa Eyesan, said the decision demonstrated what could be achieved through consistent policy direction, regulatory support and committed investment partners.
Eyesan attributed the milestone to the policy direction of President Bola Tinubu, particularly the executive measures aimed at improving the investment environment in Nigeria’s oil and gas sector.

“Today’s success is attributable to His Excellency, the President of the Federal Republic of Nigeria, President Bola Tinubu,” she said, adding that the project would have been difficult to conceive without the policy measures introduced by the administration.
The NUPRC boss also reaffirmed the Commission’s commitment to removing regulatory bottlenecks and creating an enabling environment for investors.
“As the Chief Regulator in the industry, we will enable business, we will unplug obstacles. The President has set the path for us, and we are determined to follow through,” Eyesan said.
The Ima gas field, discovered in 1973, is located in shallow waters near Bonny Island and straddles the OML 112 and OML 117 offshore licences. TotalEnergies, which is the operator, holds a 40 per cent interest, while indigenous Nigerian company AMNI holds 60 per cent.

The project will be developed with a single platform connected to Nigeria LNG through a 22-kilometre pipeline. Production is expected to commence in 2028, with the field projected to reach a plateau of about 350 million standard cubic feet of gas per day.
Once operational, the Ima field is expected to provide about one-third of the gas required for the ongoing NLNG Train 7 expansion, which is designed to increase Nigeria LNG’s liquefaction capacity from 22 million tonnes per annum to 30 million tonnes per annum.
TotalEnergies said the project reflects renewed investment in Nigeria’s gas sector and is designed as a low-cost, low-emissions development, with local contractors expected to execute key components of the project. The company also said about 60 per cent of the workforce during the development phase is expected to come from host communities.
The FID represents a significant step towards unlocking the long-delayed development of the Ima field and strengthening gas supply for Nigeria’s expanding LNG infrastructure.
